工程概况: Project overview 主要工程特征: Main characteristics of works 气候条件: Climatic conditions 地质状况及施工条件: Geology and construction conditions 施工部署: Construction deployment 施工目标: Construction objective 施工管理机构: Construction management mechanism 施工段划分和施工顺序: Division of construction section and sequence of construction 施工部署: Construction deployment 土建与各专业分包单位配合措施: Cooperation measures for civil work and other specialized subcontractors 施工组织管理机构高效运转保证措施: Assurance measures for highly efficient operation of management mechanism responsible for construction organization 施工准备: Construction preparation 暂设工程: Temporary works 施工用水: Water supply for construction 施工用电: Power supply for construction 施工道路及排水排污: Construction access road and drainage & blowdown 垂直运输机械选定及管理: Selection and management of vertical transport machineries 各种需用量计划表: Pla9nning chart for consumption of various resources 施工总平面布置: General construction layout 施工进度安排及保证措施: Arrangement and assurance measures for construction progress 工期安排: Arrangement of construction period 保证工期措施: Measures to ensure construction progress 主要施工方法及技术措施: Primary construction methods and technical measures 施工测量: Construction survey 测量要求: Requirement on survey 轴线: Axial line 标高: Elevation 轴线复核: Double check on axial line 沉降观察: Settlement observation 土方工程: Earthwork 降水: Underground water lowering 基坑边坡支护: Shoring of side slope for foundation pit 土方开挖: Earth excavation 土方回填: Earth back filling 钢筋工程: Reinforcement works 模板工程: Formwork 模板配备考虑: Consideration in outfit of formwork 墙体及柱子模板支撑: Formwork support for walling and pillar 对拉螺栓: Tie bolt 混凝土工程: Concrete works 混凝土原材料要求: Requirements on raw materials for concrete 混凝土外加剂: Concrete admixture 施工缝的留设: Setting of construction joint 混凝土浇筑: Concrete pouring 满水试验: Full water test 试水前的准备: Preparation prior to test 试水方法: Test method  蒸发量的测定: Mensuration of evaporating capacity 水位观测记录: Water level observation and record 水池渗水量的测定: Mensuration of water percolating capacity of water tank 排水方法: Dewatering method  砌体施工: Construction of masonry  食堂、综合楼楼地面工程: Flooring works for mess hall and office building 装饰装修工程: Decoration and face-lifting works 屋面工程: Roofing works 脚手架工程: Scaffold works 厂区道路工程: In-plant road works 给排水工程: Water supply and drainage works 电气工程: Electrical works 保证工程质量创优措施: Measures to ensure excellent construction quality 工程质量保证体系: Assurance system for construction quality 总体质量保证措施: Total quality assurance measures 质量管理施行施工过程动态管理: Dynamic quality management over construction process 工程技术档案管理: Engineering file management 各分部分项工程质量保证措施: Quality assurance measures for each partitioned works and subitem 防水混凝土工程质量保证措施: Construction quality assurance measures for waterproof concrete 防水混凝土抗渗防裂控制措施: Control Measures against Seepage and Crack of Waterproof Concrete 基础工程质量保证措施: Construction quality assurance measures for foundation works 主体工程质量保证措施: Construction quality assurance measures for main works 装饰装修工程质量保证措施: Construction quality assurance measures for decoration and face-lifting works 道路工程质量保证措施: Construction quality assurance measures for road works 安装工程质量保证措施: Construction quality assurance measures for road works 给排水工程质量保证措施: Construction quality assurance measures for water supply and sewerage works 电气工程: Electric works 常见质量通病防治措施: Preventive measures against frequently occurring common faults 安全生产及消防措施: Measures for safety in production and fire prevention 总体施工安全措施: General measures for safety construction 基础及水池施工安全措施: Safety measures for the construction of foundation and water tank 主体施工安全措施: Safety measures for the construction of main works  安装工程安全措施: Safety measures for installation works 电气工程安全措施: Safety measures for electric works 给排水工程安全措施: Safety measures for water supply and sewerage works 消防措施: Fire protection measures 成品保护措施: Protective measures for finished product 雨季施工措施: Measures for construction in rainy season  文明施工现场措施: Measures for civilized construction to be taken on site 文明施工内容: Content of civilized construction 现场文明施工管理: Civilized construction management on site 环境保护,不扰民措施: Environmental protection and non-disturbance measures 粉尘控制措施: Dust control measures 废气控制措施: Waste gas control measures 污水处理: Waste water treatment 噪音控制措施: Noise control measures 质量回访及保修: Return visit for quality monitoring and guarantee repair 临时工程用地需求表: Annexed table:Demand Schedule for Land of Temporary Works 施工进度计划网络图: Construction Schedule Network Chart 施工现场总平面布置图: General Layout for Construction Site 终沉池池壁模板支撑及施工安全防护架图: Drawing of Formwork Support for Tank Wall to Final Sedimentation Tank and Protection Rack for Safety Construction 终沉池中心控制点平面示意图: Schematic Plan for Central Control Point of Final Sedimentation Tank 终沉池.厌氧池及双沟式氧化池基坑排水沟平面图: Plan of Drains for Final Sedimentation Tank, Anoxic Tank and Dual Ditch Oxidation Tank 厌氧池及双沟式氧化池泵送砼浇筑流向图: Drawing of Flow Direction of Pumpcrete Casting for Anoxic Tank and Dual Ditch Oxidation Tank 基坑护坡钢筋锚杆、伸缩缝节点大样: Enlarged Detail of Reinforcement Anchor Bar for Revetment of Foundation Pit and Expansion Joint Node 终沉池池壁支模平面图: Plan of Formwork Erection for Tank Wall to Final Sedimentation Tank 接触池模板支撑图: Drawing for Formwork Support of Contact Tank 污泥脱水间、贮泥柜模板支撑图: Drawing of Formwork Support for Sludge Dewatering Chamber and Mud Storage Tank 柱基模板及支撑、地沟支模图: Drawing of Formwork & Support for Column Base and Formwork Erection of Trench 框架柱、现浇梁板模板及支撑示意图: Schematic Diagram of Frame Column,  Formwork and Support for Cast-in-site Beam Slab 框架构造柱、圆柱模板图: Formwork Drawing for Constructional Column of Frame and Round Column 现浇楼梯支模图: Drawing for Formwork Erection of Cast-in-site Staircase 公司企业管理保证体系: Management Assurance System for Company Enterprise 质量保证体系图: Quality Assurance System Chart 工程质量监督体系图: Construction Quality Supervision System Chart 单位工程施工档案资料管理职责体系: Responsibility System for File Data Management Related to Unit Works Construction 安全生产管理系统图: Management system chart for safety in production 方针目标管理: Management by guiding principle and objective 工期目标: Objective for construction period 质量目标: Quality objectives 安全目标: Safety objective 施工计划安排: Construction scheduling 施工顺序及穿插: Sequence of construction and crossing 施工段落的划分: Division of construction sections 工程总进度计划: Aggregate schedule of project 施工总平面布置: General layout of construction 施工便道: Construction access road 临时设施: Temporary facilities 施工现场临时用电: Temporary power supply on construction site 施工现场临时用水: Temporary water supply on construction site 劳动力调配: Allocation of the labour force 材料配备: Provision of materials 施工准备: Construction preparation 技术准备: Technical preparation 组织对图纸的学习和会审: Organization of study and joint review on drawings 编制施工方案和预算: Compilation of construction scheme and budget 施工组织准备: Organization and preparation of construction 成立工程现场指挥部: Establishment of on-site project headquarters 组建分段项目经理部: Establishment of divisional Project Manager Dept. 土方机械及吊装机械的选择和布置: Selection and arrangement of earthmoving machinery and lifting machinery 吊装机械的选择: Selection of lifting machinery 其它机械的选择: Selection of other machineries 管线明开槽段施工技术措施: Technical measures for open slotted section of pipeline 主要施工程序: Main construction procedure 测量放线: Survey and setting out 降水、排水施工方案: Construction scheme for water lowering and drainage 沟槽开挖施工方案: Construction scheme for trench excavation 管道及构筑物工程施工方案: Engineering construction scheme for pipeline and structure 基础处理: Foundation treatment 管基: Pipe foundation 下管、安管: Emplacement and erection of pipe 检查井施工: Construction of inspection chamber 沟槽回填土方施工方案: Construction scheme for trench backfilling earth work 顶管段(采用机械化顶管)施工技术措施: Engineering technical measures for pipe pushing section (machinery jacking to be adopted) 地面加固所用机具、材料要求: Requirements on machines, tools and materials employed for strengthening of earth surface 顶管管前土壤加固: Strengthening of soil in front of push pipe 超前小导管注浆: Advanced tubule grouting 加泥式土压平衡顶管法主要施工技术措施: Main engineering technical measures for mud-fed earth pressure balanced pipe jacking method 加泥式土压平衡顶管设备简介: Brief introduction on mud-fed earth pressure balanced jacking plant 工作坑布置: Arrangement of working pit 顶管施工测量 Survey for pipe pushing 工作井施工: Construction of working pit 土压平衡顶管机的就位: Emplacement of soil pressure balanced pipe pushing jack 起重设备: Hoisting equipment 土压平衡顶管土仓压力、顶力、及中继间位置确定: Determination of pressure on earth bin of earth pressure balanced push pipe, push force and location of relay compartment 顶进施工: Jacking construction 接收井施工: Construction of receiving pit 触变泥浆减阻: Drag reduction of thixotropic slurry 水泥、粉煤灰补浆: Cement and coal ash slurry 顶管段(采用常规式顶管)施工技术措施: Engineering technical measures for pipe pushing section (conventional jacking to be adopted) 工作坑布置: Arrangement of working pit 工作坑施工: Construction of working pit 顶管方法: Jacking method 顶管推力计算: Calculation of thrust force in jacking 顶管工作坑和接收坑: Working pit and receiving pit for jacking 主顶设备: Main plant 顶铁: Jacking shim 基坑基础及导轨: Foundation and slide guide of foundation pit 后背墙: Back wall 推进用管及接口: Pipe and connecting piece for jacking 顶管平台: Platform for push pipe 顶进与纠偏: Jacking and deviation rectification 管道闭水还土施工: Full water test and backfilling of pipe 闭水试验: Full water test 还土及道路恢复: Backfilling and restoration of road 检查井施工: Construction of inspection chamber 土方开挖: Earth excavation 钢筋混凝土检查井: R.C. inspection chamber 工程质量保证措施: Construction quality assurance measures 质量管理工作: Quality management work 质量保证措施: Quality assurance measures 质量控制: Quality control 质量标准及检验方法: Quality standard and inspection procedure 顶管安全保证措施: Safety guarantee measures for jacking 土方工程安全防护: Earthwork safety protection 操作人员个人安全防护: Personal safety protection of operating staff 临时用电安全防护: Safety protection of temporary power supply 施工机械安全防护: Safety protection of construction machinery 文明施工措施: Measures for civilized construction 建立文明施工组织机构: Establishment of organizational structure for civilized construction 开展文明、安全工地教育活动: Organization of Educational activity on civilized and safe construction site 与施工管线交叉的障碍物: Obstruction across construction pipeline 施工机械使用: Employment of construction machinery 材料码放: Placing of materials 施工人员着装: Dressing of construction staff 施工机械: Construction machinery 施工材料: Construction materials 施工文明: Civilized construction 内业数据管理: Technical data management 与施工现场周边协调: Peripheral coordination of construction site 施工现场环境保护措施: Antipollution measures on construction site 防止大气污染: Prevention of atmospheric pollution 防止水污染: Prevention of water pollution 防止噪声污染: Prevention of construction noise pollution 溢流井施工技术措施: Engineering technical measures for overflow chamber 土方开挖: Earth excavation 钢筋工程: Reinforcement works 模板工程: Formwork 混凝土工程: Concrete works 各项技术保证措施: Technical assurance measures 施工进度保证措施: Construction progress assurance measures 工程质量保证措施: Construction quality assurance measures 雨季施工保护与防护措施: Protection and safeguard procedures for rainy season construction 安全、文明施工保证措施: Assurance measures for safety and civilized construction 数据管理: Data management 附表: Annexed tables 地下防水工程质量验收规范: Quality Acceptance Specification for Underground Waterproofing Works 多孔砖砌体结构技术规范: Technical Specification for Perforated Brick Masonry Structure 混凝土结构工程施工质量验收规范: Quality Acceptance Specification for the Construction of Concrete Structure Works 建筑工程施工质量验收统一标准: Unified Quality Acceptance Standards for Construction Project 地下工程防水技术规范: Technical Regulation for Underground Waterproof Works 建筑基坑支护技术规程: Technical Regulation for Shoring of Construction Pit 组合钢模板技术规范: Technical Specification for Assembled Steel Form Work 建筑施工门式钢管脚手架安全技术规范: Safety Technique Specifications for Gate Type Tubular Scaffold Employed in Architectural Construction 建筑施工扣件式钢管脚手架安全技术规范: Safety Technique Specifications for Fastener Type Tubular Scaffold Employed in Architectural Construction 建筑地基基础工程施工质量验收规范: Construction Quality Acceptance Specification for Foundation Works of Architectural Ground Base 砌体工程施工质量验收规范: Construction Quality Acceptance Specification for Bricking-up Works 外墙饰面砖工程施工及验收规程: Construction and Acceptance Regulation for Exterior Wall Facebrick Works 屋面工程质量验收规范: Quality Acceptance Specification for Roofing Works 建筑地面工程施工质量验收规范: Construction Quality Acceptance Specification for Architectural Surface Works 人防工程施工及验收规范: Construction and Acceptance Specification for Civil Defense Works 给水排水管道工程施工及验收规范: Construction and Acceptance Specification for Water Supply and Discharge Pipeline Works 建筑气工程施工质量验收规范: Construction Quality Acceptance Specification for Architectural Electrical Works 电气装置安装工程电缆线路施工及验收规范: Construction and Acceptance Specification for Cabling of Electrical Equipment Installation Works 电气装置安装工程接地装置施工及验收规范: Construction and Acceptance Specification for Electrical Equipment Installation Works 电气装置安装工程电气照明装置施工及验收规范: Construction and Acceptance Specification for Electric Lighting Apparatus in Electrical Equipment Installation Works 建筑排水硬聚氯乙烯管道工程技术规程: Engineering Technical Regulation for Hard Polvinyl Choride Pipeline Employed in Construction Drainage 现场设备、工业管道焊接工程施工及验收规范: Construction and Acceptance Specification for Site Plant and Industrial Pipeline Welding Works 电气装置安装工程1KV及以下配线工程施工及验收规范: Construction and Acceptance Specification for Wiring at 1KV or below for Electrical Equipment Installation Works 建筑电气工程施工质量验收规范: Construction Quality Acceptance Specification for Architectural Electrical Works 建筑防腐蚀工程施工质量验收规范: Construction Quality Acceptance Specification for Architectural Corrosion Protection Works 编制说明: Explanation of preparation 编制依据: Base of preparation 招标书的主要规定: Main requirements in tendering document. 招标范围: Scope of tender 工程质量标准: Construction quality standard 工期要求: Construction period requirement 施工现场条件: Construction condition on site 招标方式: Tendering mode 投标截止时间: Deadline of tender bidding 编制范围及内容: Scope and content of preparation 本工程选用的规范目录: Catalog of specifications to be applied in this project 工程概况: Overview of project 简介: Brief introduction 工程设计总体描述: General description of engineering design 处理工艺流程: Treatment process flow 功能及技术参数: Function and technical parameters 工程概况: Overview 工程特点: Features 施工准备: construction preparation 组织管理: Organization and management 指导思想: Guiding principle 施工组织: Construction organization 组建精干高效的项目管理机构: Establishment of highly efficient project management organization 项目管理体制: Project management system 施工组织机构的高效运作: Highly efficient operation of construction organization 工程施工质量管理: Construction quality management 安全管理和消防、保卫管理: Safety management, fire control and security management     环境保护与文明施工管理: Environmental protection & civilized construction management 成本管理: Cost management 项目合同管理: Project contract management 信息化管理: Information management 项目资金管理: Project capital management 工程管理目标: Project management objective 施工总体目标: General objective of construction 工程质量目标: Construction quality objective 工程进度目标: Construction progress objective 安全生产目标: Objective for safety in production 文明施工目标: Civilized construction objective 技术资料管理目标: Technical data management objective 施工协调目标: Construction coordination objective 服务目标: Service objective 施工部署: Construction deployment 施工指导方针: Guiding principle for construction 施工安排: Construction arrangement 施工准备: Construction preparation 施工协调管理: Construction coordination and management 总承包综合管理: Comprehensive management exercised by primary contractor  总包与业主的施工配合: Construction cooperation between the primary contractor and the Employer 总包与监理的施工配合: Construction cooperation between the general contractor and the Engineer 总包与设计院的工作配合: Cooperation between general contractor and design institute 加强综合协调,发挥总包职能: Enhance comprehensive coordination to fully perfrom functions of general contractor 成本管理: Cost management 施工准备: Construction preparation 技术准备: Technical preparation 施工现场准备: Construction preparation on site 水、电准备: Arrangement of water & power supply  准备工作安排: Arrangement of preparatory work 劳动力、机具、材料等资源准备: Preparation of manpower, machinery and material, etc. 施工进度网络计划: Network construction progress schedule 工程简介及业主的工期要求: Brief introduction to the project & construction period requirement of the Employer 工程施工的总体安排: General arrangement of construction 群体工程施工总体安排: General arrangement of group works 每栋单体工程的施工安排: Construction arrangement of unit work 工程的总工期目标: total construction period objective 施工工期的具体安排: Detailed arrangement of construction period 确保工期的技术组织措施: technical and organizational measures to ensure construction period 施工总平面布置: General construction layout 施工总平面布置的原则: principle of general construction layout 施工总平面布置: General construction layout 施工给水排水平面布置: plan layout of water supply and drainage for construction 施工现场用电线路布置: Cable arrangement for power supply on site  施工现场环境保护布置: Environment protection arrangement on site 安全文明施工布置: Arrangement of safe & civilized construction  施工总平面布置图: General construction layout  分部工程及重要工序的施工方案: Construction scheme for divisional works and important processes 施工测量: Construction measurement 基础工程施工方案: Construction scheme for foundation works 主体工程施工施工方案: Construction scheme for main works 装饰工程施工施工方案: Construction scheme for decoration works 总体工程施工: Construction of system works 排水工程施工方法及技术要求: Construction methods and technical requirements for drainage works 施工工序: Construction procedures 道路施工: Construction of roads 连砂石垫层: Sand gravel cushion 围墙门卫室等其他杂项施工方法: Construction methods of enclosing wall, guard house and other piecemeal items 质量保证措施: Quality assurance measures 质量目标: Quality objective 质量管理体系: Quality control system  项目质量管理体系的建立: Establishment of project quality control system 工程质量管理组织措施: Organizational measures for project quality control 工程质量管理制度: Project quality control system 工程质量保证措施: Project quality assurance measures 工程质量控制原则: Project quality control principles 程质量保证措施: Project quality control measures 加强施工各阶段的质量控制: Enhanced quality control in each stage of construction 施工测量控制措施: Control measures for construction survey 土方工程控制措施: Control measures of earthworks 钢筋工程保证质量技术组织措施: Technical and organizational measures for quality assurance of steel reinforcement works 模板工程保证质量的技术组织措施: Technical and organizational measures for quality assurance of formwork works 柱节点处理: Treatment of node point to column 现浇钢筋砼框架柱位移的防治: Prevention and treatment of displacement of cast-in-site R.C. frame 混凝土保证质量的技术组织措施: Technical and organizational measures for quality assurance of concrete 混凝土质量控制一般措施: General measures for quality control of concrete 防水砼: Waterproof concrete 泵送砼: Pumpcrete 大体积砼的质保措施: Quality assurance measures for mass concrete 防水工程保证质量技术组织措施: Technical and organizational measures for quality assurance of waterproof works 装饰工程质量控制措施: Quality control measures for decoration works 地面面层不规则裂缝防治: Prevention and treatment of irregular cracks in floor surface 地面空鼓防治措施: Prevention and treatment measures for void and bulge of floor 地面起砂: Floor dusting 楼梯踏步宽度、高度不一: Stair steps with non-uniform widths and heights  穿地面管洞及地漏周渗漏: Leakage of holes for cross-ground pipe and floor drain 抹灰层、空鼓、裂缝防治措施: Prevention and treatment measures for floated coat, void,bulge and cracks 混凝土顶板抹灰空鼓、裂缝防治措施: Prevention and treatment measures for flocated coat, void,bulge and cracks in  concrete top plate 外墙面砖空鼓、脱落防治措施: Prevention and treatment measures for void,bulge and scale-off in/of face tile on external wall 外墙面砖分格缝不均匀,墙面不平整防治措施: Prevention and treatment measures for non-uniform division joints of external wall bricks and irregular wall face 计量及试验保证质量技术措施: Technical measures for quality assurance of measurement and test 成品保护措施: Protective measures for finished product 管理制度: Management system 保证质量技术措施: Technical measures for quality assurance 交叉作业保护措施: Protective measures for cross-operation 季节性施工技术措施: Technical measures for seasonal construction 雨季施工措施: Measures for construction in rainy season 冬期施工措施: Measures for construction in winter 重要部位的保证质量技术措施: Technical measures for quality assurance of important parts 防止室内楼地面在门口处不规则开裂的措施: Prevention measures for irregular cracks in indoor floor at door 卫生间穿墙管处瓷砖套割的措施: Measures for processing ceramic tile through which wall pipe runs in toilet 卫生间防水、防渗措施: Waterproof and leakageproof measures for toilet  安装工程的质量保证措施: Quality assurance measures for installation works 材料设备的质量控制: Quality control of materials and equipments 其他分项工程保证质量的技术组织措施: Technical and organizational measures for quality assurance of other sub-divisional works 分项工程质量控制程序图: Procedure diagram for quality control of sub-divisional works 主要施工机具的配置或选择: Provision or selection of main construction machineries and tools 本工程主要施工机械的配备: Allocation of main construction machineries employed for the project 土建工程施工机械一览表: Detailed list of construction machineries for civil works 安装工程主要设备机械一览表: Detailed list of main plant and machineries for installation works 施工机械设备的合理使用: Rational use of mechanical construction plant 施工机械设备的保养与维护: Service and maintenance of mechanical construction plant 劳动力安排计划: Manpower arrangement plan 劳动力安排的组织措施: Measures for organization of manpower arrangement 各阶段的劳动力安排: Manpower arrangement in different stages 各阶段劳动力组织原则: Principle in Organization of manpower in different stages 地下降水施工阶段: Construction stage for underground water lowering  土方人工开挖阶段: Construction stage for manual excavation 地下结构施工阶段: Construction stage for underground structure  主体结构施工阶段: Construction stage for main structure  装饰阶段室内抹灰楼面施工阶段: Floor construction for indoor plastering in decoration stage 装饰工程施工阶段: Construction stage in decoration works 竣工收尾阶段的劳动力安排: Manpower arrangement in final stage before completion 劳动力安排计划表: Manpower arrangement schedule 安全保证措施: Safety guarantee measure 安全目标: Safety objective 组织管理措施: Organization & management measures 建立严密的安全施工制度: Establishment of strict safe construction system 层层落实安全责任制: Implementation of safety responsibility system at all levels 编制安全技术措施制度: Preparation of technical method system in safety 定期检查与跟踪相结合的检查制度: Inspection system combined with periodic inspection and tracking 
|
|
| |
|
|
|